Near Bengaluru · Andhra Pradesh · India
A university that produces AI engineers. The compute they build on. The companies that hire them.
One hundred acres, three assets, one campus. Each phase is built on revenue the previous phase already earns.
Intelligence, compounded.
Three bars, each longer than the one above it — university, compute, technology park. Every phase compounds the last.
- 100 acres
- Single contiguous campus
- NH-44
- Frontage on India's longest highway
- 1 hour
- From Bengaluru international airport
- 3 phases
- Each funded by the one before it
One campus, three assets
Each asset makes the next one stronger.
- Asset one
The university
A private AI university that teaches on production infrastructure. Graduates leave having trained real models on real GPUs, not simulations.
Supplies talent
- Asset two
The compute facility
GPU capacity the university trains on, and sells to companies that need it. The same racks serve classrooms by design and customers by contract.
Generates revenue
- Asset three
The technology park
Where the companies those engineers join, and start, set up. Talent, compute, and tenants on one site, not spread across a city.
Anchors demand
The mechanism
Why three assets beat one.
- Talent
- Compute demand
- Revenue
- Companies
- Park
- Back to talent
The university produces engineers. Engineers create demand for compute. Compute generates revenue. Revenue attracts companies. Companies fill the park, and hire the next class. Each turn of the loop lowers the cost of the next.
The build
Phased, not speculative.
- 01Phase
University and first compute
Teaching starts. The first GPU capacity comes online and begins earning.
Revenue from day one of operations
- 02Phase
Compute at scale
Capacity expands against demand already proven by the first phase.
Cash flow funds phase three
- 03Phase
Technology park
Companies move onto the campus their engineers came from.
Long-term tenancy and land value
The site
On the highway, an hour from the airport.
The campus sits on NH-44 in Andhra Pradesh, within an hour's drive of Bengaluru's international airport — close enough to draw on the region's engineering base, far enough to hold a hundred contiguous acres.
- Location
- NH-44, Andhra Pradesh, India
- Land
- 100 acres, single contiguous parcel
- Airport
- Bengaluru international, ~1 hour
- Programme
- University · compute · technology park
Partner conversations are open.
We're building AI3 with institutional partners — government, capital, and industry. If that's you, write to us.
Write to usoffice@ai3.global
NH-44, Andhra Pradesh, India
